The situation

A building order is a schedule problem before it is a product problem

On a fit-out, the specification is usually settled by the consultant and the difficulty moves elsewhere: matching a BOQ line to a real model, getting the certification into the project file, and having the goods arrive in the phase they are needed.

Sprinkler assembly and inspection

The BOQ line is not a model number. “Pendant sprinkler, concealed” leaves K-factor, temperature rating and thread standard open. We read the BOQ and come back with the models that fit, marking anything that still needs a decision.

Certification goes in the project file, not the container. CE is confirmed for sprinklers and alarm valves. It is not confirmed for extinguishers, hydrants, hoses or cabinets, and a tender that assumes otherwise fails at submission rather than at inspection.

Phasing beats speed. A hotel fit-out needs risers before it needs corridor extinguishers. Bulk production runs 35–60 days from order confirmation, so the useful conversation is about production milestones rather than one delivery date.

Product groups

Five groups cover a commercial building

Each group carries its own MOQ and its own certification position. Both are listed here rather than left to the quotation, because both change what you can commit to in a tender.

Pendant and upright sprinklers with alarm valve
01

Sprinklers & Alarm Valves

Best for wet pipe systems in hotels, offices, hospitals, schools and malls. Pendant (concealed or recessed), upright and sidewall sprinklers, alarm valves and water flow indicators. BS EN / GB. CE confirmed. MOQ 2,000 pcs sprinklers, 200 pcs valves.

See the product family See sprinklers & alarm valves
Semi-rigid hose reel and layflat hose
02

Hose Reels & Layflat Hose

Best for first-aid firefighting in corridors, stairwells and service areas. Semi-rigid reels (swinging arm or recessed cabinet), layflat hose DN25–DN65, nozzles and couplings. BS 5306 / EN 671 / GB 15090. MOQ 200 pcs.

See the product family See hoses, reels & couplings
ABC dry powder and CO2 extinguishers
03

Fire Extinguishers

Best for fire points and open-plan placement to meet building compliance. ABC dry powder at 1, 2, 4 and 6 kg, CO₂ and clean agent units. CCC / ISO 9001. CE not applicable to this line. MOQ 200 pcs.

See the product family See fire extinguishers
Wall hydrant and landing valve
04

Hydrants & Landing Valves

Best for building perimeter hydrant access and dry or wet riser connections. Wall hydrants, landing valves, breeching inlets and outlets, and FDC connections. BS / EN / GB. MOQ 200 pcs.

See the product family See hydrants & monitors
Recessed hose reel cabinet
05

Cabinets & Enclosures

Best for code-compliant storage in public corridors and lobbies, where the enclosure has to suit a finished interior. Hose reel cabinets (recessed or surface), extinguisher cabinets, hydrant enclosures and combination cabinets. Custom sizes standard. MOQ 200 pcs.

See the product family See cabinets & accessories

Selection logic

Who is buying decides how we quote

The same building order reaches us from four directions, and each one needs a different quotation format and a different documentation package.

BuyerWhat they are sourcingWhat we provide
M&E contractorSprinkler system components, alarm valves, flow indicators for new-build and fit-outBOQ pricing with consistent specifications and phased delivery options
Fire protection contractorExtinguishers, hose reels, hydrants, cabinets and sprinkler components for compliance fit-outAll categories on one order, one contact, one shipment
Developer / quantity surveyorDirect procurement against project specification and budgetSpecification documentation, test certificates and CE declarations for the project file
Regional distributorA stocking range for local contractors and installersMOQ 200 pcs baseline across lines, so inventory entry stays manageable

Evidence

What you can verify before committing the project

For a new supplier on a specified job, the sample stage is where the risk actually sits. Samples run on the standard lines with the same material specification as the bulk order.

Production line
Samples in 15–20 days for performance and dimensional check
Component machining
Twenty production lines, 193 employees, 15,000 m²
Test bench
Incoming, in-process and final inspection before packing
Packing and marking
Third-party pre-shipment inspection: SGS, Bureau Veritas, Intertek

How it runs

From BOQ to delivery, in four steps

Nothing here is unusual. It is written down because on a phased job the sequence matters more than the individual steps.

  1. 01

    Send the BOQ

    Bill of quantities, product schedule or specification sheets. We review and identify the matching products, and flag any line where the specification leaves a real choice open.

  2. 02

    Quotation and documents

    Within one business day: factory-direct pricing, the certifications that apply per line (CE for sprinklers and valves, CCC for extinguishers and hoses), and specification documentation for the project file.

  3. 03

    Sample confirmation

    Optional, and worth taking for a new supplier or a critical specification. Physical samples in 15–20 days for performance and dimensional verification before the bulk order.

  4. 04

    Production and delivery

    Bulk lead time is 35–60 days from order confirmation. For a phased job we agree production milestones rather than one date. EXW, FOB or CIF depending on your logistics arrangement.

Before you send it

Four things that make a building BOQ quotable

Anything you cannot settle yet can be marked open. We quote the fixed lines and list the rest rather than assume a value and price it.

Cabinet range for building installations

Quantity per model, not per project. Sprinklers carry a 2,000 pcs MOQ against 200 pcs for everything else, so the split across models changes what is orderable long before it changes the price.

The standard the destination accepts. BS, EN and GB differ on thread and coupling, and a hydrant that suits one market will not connect in another.

Which certifications the tender requires. Ask for CE only where it exists — sprinklers and alarm valves. For the other lines we supply CCC and ISO 9001 documentation, and say so up front.

Cabinet dimensions, with the wall opening. Recessed enclosures are sized to the recess, not to the equipment. Send both and the drawing if you have one.

Common questions

Questions from contractors and procurement teams

Can I source every product for a building project here?

Six categories are made in-house: extinguishers, foam suppression, sprinklers and alarm valves, hydrants and monitors, hoses and reels, and cabinets. A typical commercial building draws on five of the six, which is why mixed orders and a single shipment are the normal arrangement rather than an exception.

Which products carry CE marking?

Sprinklers and alarm valves. CE is not confirmed for extinguishers, hydrants, hoses or cabinets. The factory operates under ISO 9001 across all lines and extinguishers hold CCC. We state the difference before a tender rather than after it.

What is the MOQ on a building order?

200 pcs per model on most lines. Sprinklers are 2,000 pcs because of the production batch. Mixed orders across categories are accepted within one purchase order, so the MOQ applies per model rather than per shipment.

What is the lead time?

Sample review is 15–20 days from payment confirmation. Bulk production runs 35–60 days from order confirmation. On a phased fit-out we agree production milestones so the risers arrive before the corridor equipment.

Can you supply against our BOQ format?

Yes. Send the bill of quantities, product schedule or specification sheets in whatever format you hold them. We return a line-item quotation that keeps your line references, so it can go back into your project file without re-keying.

What documentation comes with the order?

Product specification documentation, test certificates, CE declarations for the CE-certified lines, and the ISO 9001 factory certificate. Third-party pre-shipment inspection is supported, including SGS, Bureau Veritas and Intertek, if the project requires it.

Do you make cabinets to our recess dimensions?

Yes — custom sizing is standard production rather than a special request. Send the enclosure dimensions and the wall opening, plus the mounting type and door configuration. Custom dimensions run 45–60 days rather than the standard 35–45.

Can you hold stock for a phased project?

Production milestones can be agreed against a phased delivery schedule, which is usually more useful than holding finished stock. Tell us the phase dates with the BOQ and we will say which of them the lead times support.

BOQ review

Send the BOQ or the product list

We reply within one business day with factory-direct pricing, the certification position line by line, and production availability against your phase dates.